Factory air purification and filter system retrofit at STRABAG in Spittal an der Drau

At the STRABAG BMTI GmbH production site, an existing filtration system was to be modernized in order to improve industrial air purification and reduce energy consumption. INFRANORM® integrated the existing system into an expanded overall system featuring additional filtration technology as well as summer and winter operation modes tailored to demand. This made it possible to continue using the existing infrastructure while simultaneously improving air quality.

Please give your targeting consent to watch this video. By doing so, you agree that when you play the video, data will be transmitted to YouTube and collected by this provider.

Give targeting consent
Ein glücklicher Kunde steht vor seiner Präzisionsklimatisierung und schüttelt einem Infranorm Mitarbeiter die Hand

Project details

An older filtration system for indoor air filtration had already been installed at the STRABAG production facility. The airflow had to be optimized to more effectively capture contaminated air at ceiling level. At the same time, the existing filtration capacity was insufficient for the required air volume.

A key requirement was integration into the existing infrastructure. In addition, operation had to be adjusted seasonally: In the summer, the goal was to avoid unnecessary heat gain, while in the winter, the existing heat in the hall was to be reused as much as possible.

INFRANORM® integrated the existing system into an expanded hall air purification system and added a new cartridge filter. This increases the total exhaust capacity to up to 17,000 m³/h. Three exhaust lines capture diffuse emissions beneath the hall ceiling. Using an outside air/recirculated air switch, contaminated air is exhausted in the summer, while in the winter, purified air is recirculated into the hall via HEPA filters and displacement ventilation outlets.

The result is improved air quality in the hall with up to 5.8 air changes per hour and residual emissions of < 0.5 mg/m³. At the same time, the retrofit enables demand-based summer and winter operation and preserves key components of the existing system infrastructure.

“By modernizing the existing filtration system, we were able to improve air quality in the production hall while also implementing an energy-efficient solution for both summer and winter operations. We made good use of the existing infrastructure in the process.”

Ing. Michel Abwerzger

Specialist Service STRABAG BMTI GmbH

The customer company

STRABAG is one of Europe's leading technology groups in the field of construction services and operates across the entire value chain of the construction industry. Within the group, STRABAG BMTI GmbH consolidates technical services and supports the operating units with machinery, equipment, and service solutions.

The Strabag site in Spittal an der Drau

Learn more about this project

Download the best practice PDF for this project now – simply fill out the form and receive even more information.

Vielen Dank für Ihre Angaben!
Ihr PDF steht jetzt zum Download bereit.
Oops! Etwas ist schief gelaufen. Bitte versuchen Sie es erneut.

synopsis

The project at STRABAG highlights the potential of targeted retrofitting of existing filtration technology. Instead of completely replacing the existing system, the existing infrastructure was upgraded and adapted to meet the latest requirements for air purification in production halls.

The benefits for STRABAG:

  • Improved indoor air quality through targeted removal of diffuse emissions
  • Exhaust air flow rate of up to 17,000 m³/h
  • Up to 5.8 air changes per hour
  • Utilization of existing plant heat in the winter
  • Continued use of the existing filter system instead of a complete replacement