Heat recovery and energy optimization in glass production at Stölzle
Stoelzle Oberglas operates an energy-intensive glass production facility and has therefore been relying on heat recovery for many years. The existing heat exchanger was contaminated with heavy deposits and could only deliver a fraction of its intended performance. The aim of the project was to significantly increase energy efficiency and feed the waste heat from the glass tank back into the district heating network in its entirety.

Please give your targeting consent to watch this video. By doing so, you agree that when you play the video, data will be transmitted to YouTube and collected by this provider.
Give targeting consent
- Sector: Building materials and glass
- Customer: Stölzle Oberglas GmbH
- Location: Köflach, Austria
- Category: Production infrastructure
- Solution: Extraction and filter technology, utilization of waste heat
- KPIs: Heat extraction up to 1.4 MW, 6,000,000 kWh energy supply per year
- Year of execution: 2024
Project details
The old heat exchanger was heavily clogged by deposits and was only able to utilize around 200 kW of heat from glass production. INFRANORM® replaced the entire shell-and-tube heat exchanger and thus restored the original output of around 1.4 MW. During the replacement, two cranes were used to safely carry out the precise lifting and assembly work. The downtime remained minimal. By the new heat exchanger the annual energy supply increases to six million kilowatt hours and profitability increases significantly.
The result: Maximum energy efficiency, significant cost savings and an important contribution to the company's sustainability goals.
“Optimizing the heat exchanger is an important step towards sustainable production. The significantly increased heat recovery confirms the success of the exchange. ”
Volker Skrbinjek
Project manager, Stölzle Oberglas GmbH
The customer company
Stölzle Oberglas has been manufacturing high-quality packaging glass for pharmaceuticals, cosmetics, spirits and food since 1871. The company is one of the leading European manufacturers of sustainable glass packaging and is intensively involved in research, digitization and environmental protection.

Learn more about this project
Download the best practice PDF for this project now – simply fill out the form and receive even more information.
synopsis
The project at Stölzle Oberglas shows how significant efficiency potential can be utilized through the targeted use of modern energy technology. INFRANORM® has answered the challenge of upgrading the heavily polluted heat exchanger with a sustainable and powerful solution. Our service included the complete replacement of the shell-and-tube heat exchanger, including coordination of lifting and installation work.
The profit for Stölzle Oberglas:
- Restoring full heat recovery of around 1.4 MW
- 6 million kilowatt-hours of additional energy supply annually
- Minimal plant downtime during implementation
In short: A modern heat recovery solution that protects energy, costs and the environment in equal measure.

